TRENعربي Order list
Bucak Metal & BIA

Manufacturing power

Machining, plating, assembly, testing and shipping of valves and fittings — all on controlled lines.

Production film

60 seconds inside the factory

250people in production
8.5 munits / month total capacity
3,000 tbrass processed monthly
36,000 tannual capacity
Production lines

Inside the factory

Transfer production line
41 transfer machines

Transfer production line

Semi-finished parts are machined on automatic transfer machines built for series production.

CNC mould & tool making
38 CNC machines

CNC mould & tool making

Moulds and tools are produced with CNC technology for dimensional consistency.

Automatic CNC production
400,000 parts / month

Automatic CNC production

Brass bars are machined into valve balls, gland parts and other brass components.

Manifold machining line
8 manifold machining units

Manifold machining line

An automatic transfer line prepares manifold components for assembly.

Manifold assembly
2 million units / month

Manifold assembly

Machined parts are assembled to specification into complete manifold systems.

Ball valve assembly
7 million units / month

Ball valve assembly

Machined and plated parts become finished ball valves on the assembly line.

Brass bar raw material
Process

Control at every stage

01Machining — Precision machining of semi-finished parts
02Plating — Nickel plating for surface quality
03Assembly — Assembly of components to specification
04Quality control — Leak tests and product inspection
05Packing — Packing of approved products
06Shipping — Order picking and warehousing
Machine park

163 machines

UnitQty
Transfer machines41
CNC machines38
Turret machines12
Manifold machining8
Assembly machines53
QC & test machines11
Monthly capacity

Output by line

Line / processMonthly
Transfer machines7,000,000 units
Manifold transfer line1,300,000 units
Automatic CNC400,000 parts
CNC mould & tooling50 moulds and 105 transfer jaws
Manifold assembly line2,000,000 units
Ball valve assembly line7,000,000 units
Turret / deburring5,000,000 units

Figures show different production stages and are not cumulative, as one product passes several stages.

Quality control and leak testing
Quality

Quality control & certificates

Leak testing is part of the control process for every valve and fitting, with 11 control and test machines. Certificate scope and validity are shared per product at quotation stage.

ISO 10002:2018 certificate (BIA)CE certificate of performance conformity
Our journey

Products and capacity growing together

2003Founded.
2005First valve production.
2008New production facility.
2012First exports and international markets.
2015Wider range of plumbing systems.
2018Start of PP-R pipe and fitting production.
2026CNC investments, more capacity and new export markets.

19,000 m² production area · exports to 25+ countries

WarehouseProduction lineShipment preparationFacility

Send the code and quantity — get your quote on WhatsApp.

0532 697 60 70Order list